A free, practical checklist to help you write a brief, review a supplier’s proposal or run a design meeting, so nothing important gets missed.

2 min readFor Architects, Consultants, Developers
Specification drawings

Use this checklist to write a brief, review a supplier’s proposal or organise a design-team meeting. It records what you know, what evidence you have and who will answer the open questions.

The checklist is a working record, not an acoustic design calculation. Leave an unknown requirement marked for action rather than filling it with a guessed product rating.

The project and who is responsible

  • Record the project reference, location, building use, work type and current stage.
  • Identify the architect or lead designer, acoustic adviser and ventilation or building-physics adviser.
  • Record who sets the acoustic criteria and who accepts supplier evidence.
  • Identify the applicable jurisdiction, guidance editions and approval route with the responsible advisers.

Noise and room details

  • Identify the affected rooms, elevations and operating periods.
  • Record the noise survey or assessment reference and the conditions it covers.
  • Check whether other facade or building paths need investigation.
  • Record unresolved survey or design questions with an owner and action date.

What is needed and what was assessed

  • Copy the required acoustic quantity and criterion exactly from the issued brief.
  • State whether it applies to glass, a complete window or the installed facade.
  • Record the window and ventilation operating conditions.
  • Keep the basis for the requirement and the consultant’s reference alongside it.

The proposed window and its evidence

  • Identify the Window ID, dimensions, opening arrangement and proposed system revision.
  • Record the glazing construction, frame, seals and included ventilation components.
  • Identify the report or assessment number, date, issuing organisation and applicable result.
  • Compare the assessed assembly with the proposed assembly and list every relevant difference.
  • Request a written explanation of applicability where differences exist.

Joints, fixings and everyday use

  • Identify the frame-to-wall detail and responsibility for adjacent construction.
  • Coordinate ventilation, overheating, opening use and other project requirements.
  • Check access for cleaning, operation and maintenance.
  • For heritage projects, record significance, retained features, conservation review and permissions.
  • For occupied buildings, record room access, protection and the installation programme.

Ordering and managing changes

  • Record the accepted schedule and drawing revisions.
  • Require proposed substitutions to identify differences and supporting evidence before ordering.
  • Keep the reviewer’s decision, conditions and outstanding actions with the Window ID.
  • Confirm that a quotation has not silently changed a performance requirement or operating assumption.

Installation and handover

  • Agree inspection records and the evidence needed at completion.
  • Identify any project verification method and acceptance process set by the design team.
  • Record installed changes, operating instructions and maintenance information.
  • Close outstanding actions through the responsible reviewer rather than deleting them from the record.

Download the checklist

The editable checklist includes project fields, check responses, evidence references and an action record. Download it for a meeting or print this page. The download does not require an email address or marketing consent.

Read the architect’s workflow for context, or use the window schedule and evidence template when several opening types need separate records.

Ask about a proposal

Send your professional project brief to Hugo Carter. Include the requirement and the system under discussion if those are available; do not send confidential documents without permission.

Downloads

Acoustic glazing specification checklist

Word document · 39 KB

Free to download. No registration required.